    Two Weeks on a Conneaut Deck Build With Our Crew

    From tear off to white railings, here is how a real Conneaut deck build moved day by day, with photos of our crew at work.

    Written by: Garrett StumpLast Updated: 2 min read
    Key Points: Read The Key PointsReviewed by: Garrett Stump
    Table of Contents

    Key Points

    • A deck build moves through clear stages: removal, footings and framing, decking, then railings.
    • Our core team handles the carpentry with our own crew.
    • Photos at each stage document what was found and what was built.

    People often ask what actually happens on a deck job once the work starts. Here is how one Conneaut deck build moved in July and August 2025, based on the photos our crew took along the way.

    Day one: the old deck comes off

    The old deck and stairs were removed first. That also exposed the wall behind them, where we found rotted wood at the base of the house. We wrote about that discovery in its own article, because it is one of the most common surprises on a deck replacement.

    Framing the new deck

    Two days later the new frame was going in. Joists were set, squared and fastened, and the stairs were laid out. This is the stage that decides how solid the deck will feel for years, so it gets the most attention.

    Our crew setting joists on the new Conneaut deck frame.
    Our crew setting joists on the new Conneaut deck frame.
    The frame taking shape along the back of the house.
    The frame taking shape along the back of the house.

    Laying the boards

    The next day the crew laid the deck boards across the frame. With several people working together, the surface went down quickly while the cuts and spacing stayed consistent.

    Laying deck boards, with our work trailer parked in the yard.
    Laying deck boards, with our work trailer parked in the yard.

    Railings and finishing

    The following week the railing posts went up, then the white railing sections. Railings are what make a deck feel finished, and they are also an important safety detail, so they are installed and checked carefully.

    Railing posts installed around the new deck.
    Railing posts installed around the new deck.
    White railing sections finished along the deck and stairs.
    White railing sections finished along the deck and stairs.

    Wrapping up

    In early August the final photos were taken of the finished deck. Throughout the job, photos at each stage gave the homeowner a clear record of what was found and what was built.

    Ready to plan your deck with our crew?

    Get a Free Estimate

    Frequently Asked Questions

    It depends on the size, the design, permits, weather and what is found during removal. We explain the expected sequence for your project before work begins.

    You do not have to be. We keep homeowners updated as each stage is finished and walk through any decisions that come up.

    Our in house crew builds the deck. We coordinate licensed subcontractors for regulated trades when a project needs them.

    Explore our service area

    Get a Free Estimate

    • Free detailed estimates
    • Registered and insured
    • Local Ashtabula County crew
    Get a Free Estimate

    Planning a project in Conneaut?

    Tell us what you have in mind. We'll follow up with straight answers and a detailed estimate, with no pressure to sign.

    Read More From Nailed It 440

    All stories